SW Cogen Neptune Mall Case Study 

Project:
1.4MW Neptune Mall CHP Project, Mumbai, India

Technology:
GEJ J420 Gas Genset

Highlights:

  • Chiller installed to meet Mall’s energy demands
  • 75%+ Cogen Efficiency achieved
  • Considering the benefits accrued due to free chilling provided, there is approximately savings of 6USC/Kwh resulting in annual savings of over $300,000